000 | 01583nam a22002417a 4500 | ||
---|---|---|---|
999 |
_c21539 _d21539 |
||
005 | 20220413182653.0 | ||
008 | 220214b ###||||| |||| 00| 0 spa d | ||
020 | _a0442281277 | ||
040 |
_aUNASAM - BIBLIOTECA FIC _cUNASAM - BIBLIOTECA FIC |
||
041 | _aEng. | ||
082 |
_218a ed. _a624.19 _b/B53 |
||
100 |
_934848 _aBickel, John O./Kuesel, T.R. _eautor |
||
245 |
_aTunnel Engineering Handbook/ _cJohn O.Bickel./T.R.Kuesel. |
||
250 | _a1a ed. | ||
260 |
_aLondon _bVAN NOSTRAND REINHOLD COMPANY _c1982 |
||
300 |
_a670 p. _bil, graficas, cuadros. _c26 cm |
||
505 | _aContenido: -- 1.- Tunnel Characteristics. -- 2.- Clearances and Alignment. -- 3.- Preliminary Investigations. -- 4.- Tunnel Surverys and Alignment Control. -- 5.- Soft Ground Tunneling. -- Shield Tunnels. -- 7.- Rock Tunnels. -- 8.- Mixed Face Tunneling. -- 9.- Shafts. -- 10.- Tunnel - Boring Machines. -- 11.- Materials Handling and Construction. -- 12.- Shotcrete. -- 13.- Sunken Tube Tunnels. -- 14.- Cut- and - Cover Construction. -- 15.- Subway Construction. -- 16.- Safety Provisions. -- 17.- Tunnel Finish. -- 18.- Service Buildings. -- 19.- Tunnel Ventilation. -- 20.- Tunnel Lighting. -- 21.- Power Supply, Distribution and Control. -- 22.- Signal and Communication Systems. -- 23.- Fire Protection. -- 24.- Drainage Systems. -- 25.- Tunnel Operation and Maintenace. | ||
650 | 0 |
_926873 _aCONSTRUCCIÓN DE TÚNELES |
|
650 | 0 |
_923740 _aMétodo de Perforación y Excavación de Túneles. |
|
650 | 0 |
_926522 _aDISEÑO DE TÚNELES |
|
942 |
_cLIBRO _zMMAA |